HVAC Case Study
Banner Estrella Hospital

Phoenix -
Arizona -
United States

Climate Wizard increases cooling capacity, at a modest operating cost, while improving air quality (IAQ)

The hospital wanted to improve the quality of air introduced to the kitchens but to limit the operating costs of any new equipment required. This is where Climate Wizard came in to help.

Challenge

Can Indirect Evaportive Cooling from Climate Wizard be a solution for a hospital with a real world challenge? Banner Estrella Hospital is a busy medium sized hospital that provides 24 / 7 care for the community. Part of the facility includes extensive kitchens that provide meals for patients and staff. Large kitchens have large amounts of air exhausted from cooling appliances and make-up air is often drawn from areas that are cooled by refrigerated plant. The hospital wanted to improve the quality of air introduced to the kitchens but to limit the operating costs of any new equipment required.

Solution: Climate Wizard Indirect Evaporative Pre-Cooling

Two Climate Wizard model CW-H15 indirect evaporative coolers were installed to pre-cool the air that was introduced into the existing air conditioning system. By using Climate Wizard in this way the total cooling capacity was substantially increased at a very modest operating cost while improving the air quality in the building.

Banner Estrella Hospital Climate Wizard

HVAC Case Study Overview

Industry

Health & Aged Care

Country

United States

Region

Arizona

Technology

Indirect Evaporative Cooling

Application

Pre-cooling

Brand

Climate Wizard

Products Used